When working with concrete, the quality of the mix design determines everything about the finished product. A poorly designed mix leads to lower durability rates and poor aesthetics. It can tarnish the reputation of both concrete producers and contractors. One aspect of concrete mix design that can sometimes get overlooked is the quality of cement. If the cement has problems, creating a durable, high-quality concrete mix becomes extremely challenging.
Today, we’re going to focus on one particular issue that can create a problematic batch of concrete: overheated gypsum.

Wait – there’s gypsum in cement?

Cement begins as raw materials (limestone, shale, clay, etc.) that are crushed, blended, and then ground into fine particles. The fine particles go through a cooking process in a rotary kiln and then a rapid cooling before another grinding. Gypsum is added during this second grinding stage.

Gypsum is added to the cement clinker with other grinding aids. The grinding aids keep the material from clumping or sticking to the edge of the grinder. The gypsum controls the hydration once the cement mixes with water. (Which is slightly ironic because it can also create setting problems).

While the second grinding process is not heated, it produces heat through friction. The heat generated often gets trapped, and the temperature inside the mill can reach upwards of 120 degrees Fahrenheit. If the ambient temperature outside is hot (think about a summer day in Texas, Arizona, or Nevada), the temperature inside the mill can climb even higher.

What Happens to Overheated Gypsum in Concrete?

Under ideal circumstances, the gypsum in the cement will dissolve slowly when mixed with water in the concrete. Overheated gypsum particles dissolve very rapidly and generate gypsum crystals. These gypsum crystals lock together and stiffen the mix. This is typically known as “False Set” because the crystals can be broken apart by further mixing.

Is False Set Bad?

There is very little evidence to suggest that false set will affect the long-term durability and strength of the concrete. However, the contractor’s response to a false set can impact the quality of the finished concrete. Here are some tips to protect the integrity of the concrete when dealing with a false-set situation:

  • Don’t add more water – this will change the water-cement ratio of the mix and decrease strength
  • Don’t just try to finish it – this will result in permeability and poor consolidation
  • Don’t discard the batch – the concrete can be remixed and placed again

Prevent False Set with Fritz-Pak

While remixing the concrete seems like a simple solution, it can be a hassle. It takes additional time that your crews (and your customers) weren’t expecting. It also requires effort to remix the concrete. That’s why Fritz-Pak developed our Water Conditioner. This product prevents gypsum from crystalizing when mixed with water, saving you time and energy on the job site.