While concrete is one of the most ubiquitous building materials in the world, it is also one of the most volatile. Even slight changes in the weather or a minor delay during transportation can cause the concrete to fall outside the job’s specifications. According to the National Ready Mixed Concrete Association, approximately 5% of all concrete produced in the United States was rejected from job sites for not meeting specifications. While this may not seem like much, the cost of rejected concrete adds up quickly for both the supplier and the industry.
Rejected Concrete: An Overview
The most common reasons for rejected concrete are related to the consistency or quality of the mix. If the mix doesn’t meet the required slump or air content, it will not pass the quality engineer’s inspection. Some jobs have requirements for the maximum revolutions of the concrete drum, which can be problematic if the concrete truck gets caught in traffic. Hot loads of concrete may get rejected from the job site because they cannot be finished properly.
Once the load fails the inspection, the driver usually returns it to the batch plant. Some batch plants have concrete reclaiming equipment that allows them to separate the materials for later use, but it is not uncommon for the concrete to be poured into blocks that will be used for temporary barriers. Often, the concrete will be allowed to set in molds and then crushed for use as road base.
Rejected Concrete: The Cost
While most concrete producers have a plan to minimize the environmental impact of rejected concrete, the cost associated with concrete that is sent back to the plant is significant. Based on data provided by the American Concrete Pavement Association and the NRMCA, somewhere between 15 and 25 million cubic yards of concrete were rejected from the job site in 2024. The valuation of the rejected material is estimated to be between $2.2 and $3.6 billion. And that’s just the materials. Those estimates do not include the cost of gas to return to the plant, the costs associated with disposing of the concrete, or producing a new load of concrete to send to the job site.
Additionally, there are harder-to-measure costs associated with rejecting concrete. There is a delay that happens on the job site while they wait for the new truck. This could potentially extend the deadline and increase the project’s overall labor budget. There’s also a risk of cold joints if the load that gets rejected is in the middle of a large pour. Not to mention the costs associated with damaged trust between the contractor and the concrete producers.
Rejected Concrete and Concrete Admixtures
Powdered concrete admixtures provide an easy, cost-effective solution to many of the problems that result in rejected concrete. Certain admixtures, such as air entrainers or superplasticizers, can be used to adjust the load if it fails to pass the field tests. Other admixtures, like delay set products, can be added to the truck in hot weather to ensure it doesn’t arrive at the job site partially set.
Some field engineers will say that once the concrete has been batched, it is against industry standards to add additional materials. This is simply untrue. ASTM C4 94, section 8.3 states clearly that adding admixtures to the mix is an acceptable practice to improve the quality of the material and keep loads from being rejected
Learn More
Want more information about how on-site concrete admixtures can reduce the amount of concrete rejected at a job site? Check out the applications pages to learn about specific applications for our products. Don’t forget to follow our social media channels for more information about how our products can improve your concrete.