Hot weather poses a serious challenge for contractors working with concrete. Elevated temperatures speed up hydration, which reduces the time available for placement, finishing, and proper curing. Fritz-Pak’s Mini Delayed Set admixture is designed to slow down the setting process, giving contractors more working time when they need it most.
This lab test evaluates the claim that one bag of Mini Delayed Set will delay the setting time of one yard of concrete by approximately one hour. The test was conducted in the Fritz-Pak laboratory under controlled conditions that simulate job site exposure to heat and sunlight.
Methodology
Three concrete mixes were prepared for this test:
- Mix 1 (Control): Standard mix using manufactured sand, Portland cement, and water.
- Mix 2: Identical to the control, with 0.1% (by weight of cement) dose of Fritz-Pak Standard Delayed Set.
- Mix 3: Identical to the control, with 0.2% (by weight of cement) dose of Fritz-Pak Standard Delayed Set.
These dosage levels simulate the addition of:
- 1 bag of Mini Delayed Set per yard of concrete (Mix 2)
- 2 bags of Mini Delayed Set per yard of concrete (Mix 3)
Each mix was prepared using a digital scale for precise material measurements and mixed using a tabletop mixer. After mixing, the concrete was placed into small containers and set outdoors in direct sunlight at a temperature of 86°F (30°C).
Set times were monitored using a Vicat needle at 30-minute intervals until each mix reached the initial set.
Results
The test confirmed the effectiveness of Mini Delayed Set in slowing concrete set time:
- Control Mix: Initial set at 1 hour 45 minutes
- 0.1% Dose (1 Bag): Initial set at 2 hours 30 minutes
- 0.2% Dose (2 Bags): Initial set at 3 hours 45 minutes
These results demonstrate that the product performs as advertised—each bag of Mini Delayed Set delayed setting time by approximately one hour.
Product Overview
Mini Delayed Set and Standard Delayed Set contain the same chemical formulation and meet all applicable standards, including:
- ASTM C494 Type D
- AASHTO M-194
- CRD C-87
Both products offer convenient, field-ready solutions that allow ready-mix drivers, pump operators, and finishers to adapt on the fly without remixing or retempering.
Want to Learn More?
Watch this video demonstration of this lab test in action to discover how Fritz-Pak Delayed Set admixtures can help you beat the heat on your next job. You can order both Standard Delayed Set and Mini Delayed Set right here on the website. Don’t forget to follow our social media channels for more information about how our products can improve your concrete.